Project Details

Project Details holds the basics of a project: its name and event, where the lead came from, who referred it, and what you expect from the sale. Everything is edited in one dialog, and every change is recorded on the project.

Open Project Details

  1. Open the project.
  2. On the Project Details panel, click the pencil.
  3. Change what you need, then click Save. Click Cancel to close without saving.

The dialog has three sections: Project, Lead and Sales. The help icon in the dialog's title bar opens a short summary of this page.

Project

  • Project name - what the project is called in lists and on the project page. It is required when your company requires project names; otherwise it is optional.
  • Event - the company event the project belongs to, such as a canvass or a storm. Active events are listed first, then inactive ones. An event is required.

Lead

  • Lead source - where the project came from, such as a mailer, a website or a door knock. A lead source is required. Active sources are listed first, then inactive ones.
  • Lead source cost - what this lead cost you.
  • Referred by - the contact who sent the project to you.
  • Referral date - the day of the referral.
  • Referral status - Open or Closed, for tracking whether the referral has been settled.

Search for, clear or replace the referrer

Start typing in Referred by and pick a contact from the list. Only a contact you pick is saved; text you type but do not pick is put back when you leave the field. To remove the referrer, click the x in the field.

The referral date and status belong to the referrer. When you clear the referrer, the Referral date is blanked and the Referral status goes back to Open. You can fill them in again after you pick a new referrer.

Sales

  • Appointment scheduling - choose No scheduling required or On Appointment Scheduler to put the project on the Appointment Scheduler.
  • Estimated project value - what you expect the project to be worth.
  • Estimated close date - when you expect the customer to sign.
  • Close probability - how likely the sale is.

The close probability slider

Drag the slider from 0 to 100 percent in steps of 5. The number beside it updates as you drag. At 0 the slider reads Not set, which means nobody has made an estimate yet; it does not mean the sale is impossible.

What gets logged

When you click Save, the project's Jet Stream records one entry, "Project details MODIFIED", listing each field you changed with its old and new value, for example the lead source from one name to another. Fields you did not change are not listed. Use the Jet Stream to see who changed a project's details and when.

If Save does not close the dialog

If a required field is missing, a message tells you what to fix and the dialog stays open. If the save is refused, the dialog also stays open, so your edits are not lost.

Tips

  • Lead source and Referred by answer different questions. The lead source is the channel, such as a mailer. The referrer is a person, such as a past customer. A referred project can have both.
  • Keep Lead source cost current if you track return on marketing; changing it is logged like any other field.
  • Set the estimated value, close date and probability early. They stay editable, and the change history shows how your estimate moved.
Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.